Fabriksbyggnation, installation och kundreaktion - Hur Vanguard försåg Nuffield Health med två nya operationssalar.
Denna videofallstudie ger en fullständig bild av tillverknings- och installationsprocesserna och en rundtur i den färdiga anläggningen, byggd för Nuffield Health Tees Hospital.
"One of our objectives at Nuffield Health is to provide the best possible care, the best care you can get anywhere. Part of that is making sure that the facilities in which we care for our patients are absolutely the best possible. The theatres look fabulous. The space, the light, the modern equipment; really something special."
Alex Perry, Chief Executive Officer, Nuffield Health
Using modern methods of construction (MMC), Vanguard built two operating theatres that have allowed Nuffield Health's Tees Hospital to expand elective capacity, providing excellent facilities for a wider range of vital surgical activities.
Meeting the needs of patients from the local community, including people needing joint replacements, spinal care, prostate, gynaecology, and women’s health services, these facilities include two laminar flow theatres with enhanced scrub areas, two anaesthetic rooms, two recovery rooms, staff welfare areas, spacious corridors, office space and restrooms.
"Using modern methods of construction provided a faster, more environmentally friendly, less disruptive and more cost-effective alternative to traditional building methods for Nuffield Tees Hospital. These best-in-class theatres will provide an exemplary clinical environment and help deliver essential healthcare for patients across the Teesside area for many years to come."
Chris Blackwell-Frost, Chief Executive Officer, Vanguard Healthcare Solutions
Factory Build
Modular construction enables Vanguard to build around 80% of the facility away from the construction site, at the Vanguard factory in Hull, while the ground works are being completed at the hospital. The time saved by this concurrent working is one of the benefits of MMC. Others include reduced disruption at the hospital, the protection from weather related delays, greater efficiency and better quality control.
Installation
"The main benefit of this for us is the lack of downtime. So, we don't need to shut down for weeks and weeks on end while we're building the new operating theatres."
Stacey Brunton, Health System Director, Nuffield Health
Vanguard installed the modules over one weekend. minimising the disruption for the patients, staff and neighbours of Nuffield Tees Hospital.
The Finished Facility
"Invigningen av våra nya teatrar markerar en viktig milstolpe. Med spjutspetsteknologi, förbättrad kirurgisk utrustning och fokus på patientcentrerad design är vi bättre rustade än någonsin för att tillhandahålla den högsta vårdstandarden till våra patienter. Dessa teatrar förbättrar inte bara vår förmåga att ta hand om fler människor, utan förbättrar också den övergripande patientupplevelsen, vilket säkerställer att vi levererar de bästa resultaten.”
Tony Nargol, ortopedisk kirurg, Nuffield Health
"Ett partnerskap som detta med Vanguard innebär att vi kan arbeta med en riktig specialist för att leverera uppgraderingen av anläggningar mycket snabbare än vi kunde, till lägre kostnad än vi kunde, och till en högre standard än vi förmodligen kunde på egen hand."
Alex Perry, verkställande direktör, Nuffield Health
Newcastle Westgate Cataract Center har installerats för att ta itu med den betydande eftersläpningen hos patienter som väntar på rutinoperationer för grå starr. Sedan installationen har anläggningen sett den genomsnittliga tiden som spenderas i anläggningen minska från 3-4 timmar till mellan 45 minuter och en timme.